Dewatering Screen Installation Guide
March.04,2026
⒈Check whether the motor label is in accordance with the requirements.
⒉Measure the insulation resistance with a 500-volt megohm meter. The value should be dried for the stator winding. The drying temperature should not exceed 120℃.
⒊Check the fasteners of the motor to prevent loosening.
⒋Check the motor surface for damage and deformation.
⒌Check whether the rotation is flexible, if there is any abnormality, it should be eliminated.
⒍Check the power supply, whether it is lack of phase, and run it without load for 5 minutes.

Installation and adjustment
⒈The motor should be fastened on the installation surface, and the installation surface must be smooth and flat.
⒉The motor can be installed horizontally.
⒊The motor lead adopts four-core rubber cable YZ-500V. The lead-out cable is not allowed to fold sharply when connected to the power supply, and it is reliably fixed with the vibrating body. ⒋The motor should have reliable grounding, there is a grounding device in the motor, the lead end has a mark, and it can also be grounded with a firm foot bolt.
⒌Adjustment of excitation force.
Equipment Maintenance
⒈Before starting
⑴Check whether the coarse and fine nets are damaged
⑵Check whether the transportation support is dismantled.
⒉ At startup
(1)Pay attention to whether there is abnormal noise
(2) Is the current stable?
(3) Is there any abnormality in vibration
⒊After use Regularly
check the coarse mesh, fine mesh and springs for fatigue and damage. Check whether all parts of the fuselage are damaged due to vibration. The parts that need to be lubricated must be lubricated.